Ofek Atarim, the construction division of Rimon Ltd leads the execution phase of all projects providing drilling operations using Horizontal Directional Drilling [HDD) and pipeline installation by pipe jacking technology under Rimon's Ltd subsidiary Rimon Drillings. Ofek Atarim holds the highest classifications in the market, enabling it to execute the largest water infrastructure projects worldwide. The division execute the construction of reservoirs, pump stations, pipelines for drinking and wastewater works etc. Rimon Drilling owns the best available technologies and machinery for the Pipe jacking and HDD projects and relays on years of experience in the execution of complicated and challenging projects, amongst which are the following examples:
Pipe jacking:
- Crossing of the Carmel mountain for the Mekorot water company ( 450 meters, 3.1 meter diameter)
- Crossing route no. 1 for the Mekorot water company ( 120 meters, 3.1 meter diameter)
- Crossing the Rokah Rd. and the train lines in Tel Aviv for the Igudan utility ( 500 meters, 2.16 meter diameter)
- Crossing of route 65 at Kadarim junction, for the S&B construction company ( 150 meters, 3.1 meter diameter)
- Crossing of route 6 ( 6 lanes) for the SHAHAM Mekorot water company ( 150 meters, 1.6 meter diameter)
HDD (Horizontal Directional Drilling) :
- Natural gas pipeline north – all roads, train lines and petrol line crossings
- See list of projects for more specific projects across Israel, through multiple soil types and diameters ranging from 16- 1000 MM.
The future. Founded in 1996, Rimon Ltd. is committed to continue to innovate and expand its global presence. It takes special pride in the fact that its projects benefit both individuals in their daily lives and provide environmentally safe solutions to industrial challenges.